SMART technologies
Work packages of SMART project
Deliverables of SMART project
| # | Page | Description | Start | End | Status |
|---|---|---|---|---|---|
| 101101 | Deliverable101 | Management reports, 1st series | 11 | 1212 | not finished yet |
| 102102 | Deliverable102 | Management reports, 2st series | 1212 | 2424 | not finished yet |
| 103103 | Deliverable103 | Management reports, 3rd series | 2424 | 3636 | not finished yet |
| 104104 | Deliverable104 | Technical reports on the general SMART-workshops for all partners on an annual basis (KIT) | 11 | 3636 | not finished yet |
| 105105 | Deliverable105 | Activity report of local representative | 11 | 3636 | not finished yet |
| 201201 | Deliverable201 | Maintenance and improvement reported in an updated handbook of DBMS | 3636 | not finished yet | |
| 202202 | Deliverable202 | Incorporation of SMART I datasets and continuous data acquisition | 1818 | not finished yet | |
| 203203 | Deliverable203 | Definition of exchange format protocols for the connection with SMART-DSS. Title: Allowing Exchange, Integration and Analysis of IWRM Data via the Semantic Web | 1212 | finished | |
| 204204 | Deliverable204 | Improvement of DAISY data harvester in respect to data selection, output, presentation and export from DBMS | 2424 | not finished yet | |
| 205205 | Deliverable205 | Implementation of web based visual, statistical and geostatistical tools | 11 | 1818 | not finished yet |
| 206206 | Deliverable206 | WebGIS Thematic Map Generation | 3030 | not finished yet | |
| 301301 | Deliverable301 | Delivery of sites/Model Village with an existing sewer system for approx. 650 (three plants) | 11 | 55 | not finished yet |
| 302302 | Deliverable302 | General Design of the wastewater treatment and reuse (WWT&R) units in the villages and/or subur-ban community | 22 | 66 | not finished yet |
| 303303 | Deliverable303 | Construction of the vertical soil filter WWT&R system for 250 pe. and six on-site systems (vertical soil filter, extended sludge) for 10-20 pe each. | 77 | 1818 | not finished yet |
| 304304 | Deliverable304 | Construction of the SBR-WWT&R system (250 pe.) and three SBR on-site –WWT&R systems | 77 | 1818 | not finished yet |
| 305305 | Deliverable305 | Construction of the MBR-WWT&R system (150 pe.) | 77 | 1818 | not finished yet |
| 306306 | Deliverable306 | Report on the technical and economic evaluation of the WWT&R units | 66 | 2424 | not finished yet |
| 307307 | Deliverable307 | Tested and approved remote control systems for WWT&R units that allows to detect and inform maintenance personnel about system failure and preventive information | 11 | 3636 | not finished yet |
| 308308 | Deliverable308 | Report on the potential of the anaerob-reactor and sludge bed eco-technology for treating concentrated sludge fractions | 11 | 3636 | not finished yet |
| 309309 | Deliverable309 | Optimized ecotechnology system (e.g. Recirculating Vertical Flow Filter) designed specifically to achieve the nitrogen removal targets of the Jordanian Effluent Reuse Guidelines | 11 | 3636 | not finished yet |
| 310310 | Deliverable310 | Optimized financing and maintenance model for the implementation of decentralized WWT&R systems in Jordan | 1212 | 3636 | not finished yet |
| 311311 | Deliverable311 | Identification of biodegradation processes contributing to emerging pollutant elimination | 11 | 3030 | not finished yet |
| 312312 | Deliverable312 | Demonstration of artificial recharge of flash floods | 1212 +30 | not finished yet | |
| 313313 | Deliverable313 | Demonstration of artificial recharge of treated wastewater | 1212 +30 | not finished yet | |
| 314314 | Deliverable314 | Demonstration of the efficiency of a capillarity break system for water harvesting | 11 | 3636 | not finished yet |
| 315315 | Deliverable315 | Assessment of water quality during soil infiltration, aquifer storage and recharge | 33 | 1212 +30 | not finished yet |
| 316316 | Deliverable316 | Report on Operation of MBR/soil columns pilot plant at Fuheis test site | 1212 | 3636 | not finished yet |
| 317317 | Deliverable317 | Water quality analysis in waste water and recharged groundwater | 1212 +30 | not finished yet | |
| 318318 | Deliverable318 | Identification of the most suitable areas for the implementation of groundwater artificial recharge (AR) in the LJV | not finished yet | ||
| 319319 | Deliverable319 | Economic assessment of artificial recharge | 3434 | not finished yet | |
| 320320 | Deliverable320 | Development, evaluation, comparison and ranking of AR-planning options | 2424 +34 | not finished yet | |
| 321321 | Deliverable321 | Inventory and characterization of available brackish water resources in the study area | 11 | 1212 | not finished yet |
| 322322 | Deliverable322 | Technology review addressing specific requirements of the LJV | 11 | 88 | not finished yet |
| 323323 | Deliverable323 | Selection of a suitable brackish water desalination process for the LJV | 66 | 2424 | not finished yet |
| 324324 | Deliverable324 | Report on potential sites for brackish water usage | 33 | 1212 | not finished yet |
| 325325 | Deliverable325 | Demonstration of desalination combined with aquifer storage and recovery technology | 66 | 3636 | not finished yet |
| 326326 | Deliverable326 | Environmental impact assessment for desalination technologies in the LJV | 1212 | 2828 | not finished yet |
| 327327 | Deliverable327 | Cost analysis | 1818 | 3030 | not finished yet |
| 328328 | Deliverable328 | IWRM concept of regional deployment of desalination units | 2828 | 3232 | not finished yet |
| 401401 | Deliverable401 | Data acquisition report for the input parameter of JAMS | 1212 | not finished yet | |
| 402402 | Deliverable402 | Geological and hydrogeological conceptual models incl. water budget of each sub-basin | 1818 | not finished yet | |
| 403403 | Deliverable403 | Geophysical surveys at selected hot spots | 1818 | not finished yet | |
| 404404 | Deliverable404 | Intersection of JAMS parameter in GIS applications to build up hydrological unites (HRU’s) | 1818 | not finished yet | |
| 405405 | Deliverable405 | Definition of runoff formation and -energy (development) specified to catchment and wadi course specifications | 2424 | not finished yet | |
| 406406 | Deliverable406 | Quantification and spatial delineation of currently untapped water resources (fresh and saline groundwater, runoff, wastewater) | 2020 | not finished yet | |
| 407407 | Deliverable407 | Assessment of temporal evolution of water quality in selected wadis | 1818 | not finished yet | |
| 408408 | Deliverable408 | Development of an water quality impact matrix | 2424 | not finished yet | |
| 409409 | Deliverable409 | Individual numerical transient flow models for each sub-basin | 2424 | not finished yet | |
| 410410 | Deliverable410 | Refined trans-boundary numerical groundwater model | 2424 | not finished yet | |
| 411411 | Deliverable411 | Report on JAMS modelling in the scale of the trans-boundary groundwater model | 3030 | not finished yet | |
| … further results |
Institutions within SMART project
| Website | |
|---|---|
| KIT | http://www.kit.edu |
| UFZ-G |