SMART technologies


Work packages of SMART project


Deliverables of SMART project

# Page Description Start End Status
101101 Deliverable101 Management reports, 1st series 11 1212 not finished yet
102102 Deliverable102 Management reports, 2st series 1212 2424 not finished yet
103103 Deliverable103 Management reports, 3rd series 2424 3636 not finished yet
104104 Deliverable104 Technical reports on the general SMART-workshops for all partners on an annual basis (KIT) 11 3636 not finished yet
105105 Deliverable105 Activity report of local representative 11 3636 not finished yet
201201 Deliverable201 Maintenance and improvement reported in an updated handbook of DBMS 3636 not finished yet
202202 Deliverable202 Incorporation of SMART I datasets and continuous data acquisition 1818 not finished yet
203203 Deliverable203 Definition of exchange format protocols for the connection with SMART-DSS. Title: Allowing Exchange, Integration and Analysis of IWRM Data via the Semantic Web 1212 finished
204204 Deliverable204 Improvement of DAISY data harvester in respect to data selection, output, presentation and export from DBMS 2424 not finished yet
205205 Deliverable205 Implementation of web based visual, statistical and geostatistical tools 11 1818 not finished yet
206206 Deliverable206 WebGIS Thematic Map Generation 3030 not finished yet
301301 Deliverable301 Delivery of sites/Model Village with an existing sewer system for approx. 650 (three plants) 11 55 not finished yet
302302 Deliverable302 General Design of the wastewater treatment and reuse (WWT&R) units in the villages and/or subur-ban community 22 66 not finished yet
303303 Deliverable303 Construction of the vertical soil filter WWT&R system for 250 pe. and six on-site systems (vertical soil filter, extended sludge) for 10-20 pe each. 77 1818 not finished yet
304304 Deliverable304 Construction of the SBR-WWT&R system (250 pe.) and three SBR on-site –WWT&R systems 77 1818 not finished yet
305305 Deliverable305 Construction of the MBR-WWT&R system (150 pe.) 77 1818 not finished yet
306306 Deliverable306 Report on the technical and economic evaluation of the WWT&R units 66 2424 not finished yet
307307 Deliverable307 Tested and approved remote control systems for WWT&R units that allows to detect and inform maintenance personnel about system failure and preventive information 11 3636 not finished yet
308308 Deliverable308 Report on the potential of the anaerob-reactor and sludge bed eco-technology for treating concentrated sludge fractions 11 3636 not finished yet
309309 Deliverable309 Optimized ecotechnology system (e.g. Recirculating Vertical Flow Filter) designed specifically to achieve the nitrogen removal targets of the Jordanian Effluent Reuse Guidelines 11 3636 not finished yet
310310 Deliverable310 Optimized financing and maintenance model for the implementation of decentralized WWT&R systems in Jordan 1212 3636 not finished yet
311311 Deliverable311 Identification of biodegradation processes contributing to emerging pollutant elimination 11 3030 not finished yet
312312 Deliverable312 Demonstration of artificial recharge of flash floods 1212 +30 not finished yet
313313 Deliverable313 Demonstration of artificial recharge of treated wastewater 1212 +30 not finished yet
314314 Deliverable314 Demonstration of the efficiency of a capillarity break system for water harvesting 11 3636 not finished yet
315315 Deliverable315 Assessment of water quality during soil infiltration, aquifer storage and recharge 33 1212 +30 not finished yet
316316 Deliverable316 Report on Operation of MBR/soil columns pilot plant at Fuheis test site 1212 3636 not finished yet
317317 Deliverable317 Water quality analysis in waste water and recharged groundwater 1212 +30 not finished yet
318318 Deliverable318 Identification of the most suitable areas for the implementation of groundwater artificial recharge (AR) in the LJV not finished yet
319319 Deliverable319 Economic assessment of artificial recharge 3434 not finished yet
320320 Deliverable320  Development, evaluation, comparison and ranking of AR-planning options 2424 +34 not finished yet
321321 Deliverable321 Inventory and characterization of available brackish water resources in the study area 11 1212 not finished yet
322322 Deliverable322 Technology review addressing specific requirements of the LJV 11 88 not finished yet
323323 Deliverable323 Selection of a suitable brackish water desalination process for the LJV 66 2424 not finished yet
324324 Deliverable324 Report on potential sites for brackish water usage 33 1212 not finished yet
325325 Deliverable325 Demonstration of desalination combined with aquifer storage and recovery technology 66 3636 not finished yet
326326 Deliverable326 Environmental impact assessment for desalination technologies in the LJV 1212 2828 not finished yet
327327 Deliverable327 Cost analysis 1818 3030 not finished yet
328328 Deliverable328 IWRM concept of regional deployment of desalination units 2828 3232 not finished yet
401401 Deliverable401 Data acquisition report for the input parameter of JAMS 1212 not finished yet
402402 Deliverable402 Geological and hydrogeological conceptual models incl. water budget of each sub-basin 1818 not finished yet
403403 Deliverable403 Geophysical surveys at selected hot spots 1818 not finished yet
404404 Deliverable404 Intersection of JAMS parameter in GIS applications to build up hydrological unites (HRU’s) 1818 not finished yet
405405 Deliverable405 Definition of runoff formation and -energy (development) specified to catchment and wadi course specifications 2424 not finished yet
406406 Deliverable406 Quantification and spatial delineation of currently untapped water resources (fresh and saline groundwater, runoff, wastewater) 2020 not finished yet
407407 Deliverable407 Assessment of temporal evolution of water quality in selected wadis 1818 not finished yet
408408 Deliverable408 Development of an water quality impact matrix 2424 not finished yet
409409 Deliverable409 Individual numerical transient flow models for each sub-basin 2424 not finished yet
410410 Deliverable410 Refined trans-boundary numerical groundwater model 2424 not finished yet
411411 Deliverable411 Report on JAMS modelling in the scale of the trans-boundary groundwater model 3030 not finished yet
… further results


Institutions within SMART project


People within SMART project

Original source

View the captured original page. The historical SMART II website is credited as the source. Layout and navigation have been adapted.

Back to all recovered web pages · Browse recovered documents